Solar · United Kingdom

Quarry, Ditchford Lane - Solar Farm

Operator Novus Renewable Services

Awaiting Construction10 MWData checked 16 November 2026Source record dated 26 June 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Quarry, Ditchford Lane - Solar Farm is a 10 MW solar farm on the edge of Higham Ferrers, Northamptonshire, United Kingdom. Its planning application (NE/24/01235/FUL) went to North Northamptonshire on 23 January 2025 and was granted on appeal on 3 June 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 49 other energy sites within 10 km, 25 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Quarry, Ditchford Lane - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1448, Roof fire at new-build house with solar panels in Wellingborough, 4.8 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14482026Roof fire at new-build house with solar panels in Wellingborough4.8 kmSignificant
EIR-15452024Fire involving solar panels on a building under construction in Kettering12 kmMinor
EIR-14932026Solar panels catch fire on Bedford warehouse roof23 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Novus Renewable Services
Location
Former Quarry, 1261 Ditchford Lane, Wellingborough, Northamptonshire, NN8 1RR, United Kingdom
Planning authority
North Northamptonshire
Planning application
NE/24/01235/FUL
Appeal reference
25/00038/NON

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for NE/24/01235/FUL, with what the planning evidence pack adds for this site.

Every application in North Northamptonshire · Alerts for applications and incidents near here

  • 23 January 2025 Planning application submitted
  • 21 October 2025 Appeal lodged
  • 3 June 2026 Planning permission granted
  • 3 June 2026 Appeal granted

None found. The register holds no published incident that names Quarry, Ditchford Lane - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Quarry, Ditchford Lane - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Quarry, Ditchford Lane - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Quarry, Ditchford Lane - Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 26 June 2026.
Where is Quarry, Ditchford Lane - Solar Farm?
On the edge of Higham Ferrers, Northamptonshire, United Kingdom (postcode NN8 1RR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).