Solar · Germany
PV-FFA Niedergörsdorf
Operator RP Deutschland 11 UG
Planned16.5 MWData checked 10 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
PV-FFA Niedergörsdorf is a 16.5 MW solar farm 3.2 km south-west of Niedergörsdorf, Germany. It first operated in 2027. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 42 other energy sites within 10 km, 6 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 8 incidents at solar farms (hybrid battery and solar sites included) in Germany, and 480 worldwide.
Get an email when PV-FFA Niedergörsdorf changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in Germany. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for PV-FFA Niedergörsdorf sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 8 comparable solar incidents in Germany, nearest first. The nearest is EIR-2998, Solar panel system burns on roof of Werneuchen house, 93 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2998 | 2026 | Solar panel system burns on roof of Werneuchen house | 93 km | Significant |
| EIR-2629 | 2024 | Fire breaks out in technical room of Hesse solar park | 272 km | Significant |
| EIR-2879 | 2026 | Fire at German home with photovoltaic roof tiles injures firefighter | 311 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 5 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 16.5 MW
- Capacity figure from
- Marktstammdatenregister (Bundesnetzagentur, Germany)
- Status
- Planned (In planning)
- Operator
- RP Deutschland 11 UG
- Location
- Niedergörsdorf, Teltow-Fläming, Brandenburg, 14913, Germany
- First operating
- 2027
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names PV-FFA Niedergörsdorf. If you know of one, report it (confidential reports are anonymised).
Questions
- Has PV-FFA Niedergörsdorf had a fire or other incident?
- None is on the register as of 22 November 2026. The register holds no published incident that names PV-FFA Niedergörsdorf; it holds 8 incidents at solar farms (hybrid battery and solar sites included) in Germany.
- What is the status of PV-FFA Niedergörsdorf?
- Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
- Where is PV-FFA Niedergörsdorf?
- 3.2 km south-west of Niedergörsdorf, Germany (postcode 14913).
Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).