Planning pack for this site, £295Other options

Solar · Brazil

PS 360E Porto Real

Owner STELLANTIS AUTOMOVEIS BRASIL LTDA.

Under Construction13.2 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

PS 360E Porto Real is a 13.2 MW solar farm Porto Real, Rio de Janeiro, Brazil. It first operated in 1900. Its status in the SIGA generation register (ANEEL, Brazil) is under construction. The register holds no incident at this site. It holds 18 incidents at solar farms (hybrid battery and solar sites included) in Brazil, and 480 worldwide.

No comparable incidents are recorded near this site yet.

The register holds no solar incident to set against this site today. A pack would still set out the incidents within 50 km of any kind, sites of a similar size worldwide and the guidance consultees cite.

Order the pack for this site. £295, by email in minutes.

Technology
Solar
Capacity
13.2 MW
Capacity figure from
SIGA generation register (ANEEL, Brazil)
Status
Under Construction (Construção)
Owner
STELLANTIS AUTOMOVEIS BRASIL LTDA.
Location
Porto Real, Rio de Janeiro, Brazil
First operating
1900

  • 3 January 1900 Operational

None found. The register holds no published incident that names PS 360E Porto Real. If you know of one, report it (confidential reports are anonymised).

Has PS 360E Porto Real had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names PS 360E Porto Real; it holds 18 incidents at solar farms (hybrid battery and solar sites included) in Brazil.
What is the status of PS 360E Porto Real?
Under Construction, in the SIGA generation register (ANEEL, Brazil).
Where is PS 360E Porto Real?
Porto Real, Rio de Janeiro, Brazil.

Source: ANEEL, Sistema de Informacoes de Geracao (SIGA), Open Data Commons Open Database Licence (ODbL), dadosabertos.aneel.gov.br. The dataset. The register adds only the incidents and the counts.