Solar · United Kingdom
Preston Hill Farm, Penkridge - Solar Farm
Operator Engena Limited
Under Construction49.9 MWData checked 16 November 2026Source record dated 24 August 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Preston Hill Farm, Penkridge - Solar Farm is a 49.9 MW solar farm in Penkridge, Staffordshire, United Kingdom. Its planning application (23/00009/FUL) went to South Staffordshire on 9 January 2023 and was granted on 2 February 2024. Construction started on 1 August 2026. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 30 other energy sites within 10 km, 14 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Preston Hill Farm, Penkridge - Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Preston Hill Farm, Penkridge - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0172, Fire at Wheat Leasows solar farm in Telford involves an electricity pylon, 22 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0172 | 2026 | Fire at Wheat Leasows solar farm in Telford involves an electricity pylon | 22 km | Minor |
| EIR-1553 | 2017 | Roof fire involving 14 solar panels attended in Shropshire | 31 km | Minor |
| EIR-1546 | 2025 | Solar panel isolation switch overheats in roof fire at a house in Bucknall | 34 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 49.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- Engena Limited
- Location
- Preston Hill Farm Preston Vale Penkridge, Staffordshire, ST19 5RA, United Kingdom
- Planning authority
- South Staffordshire
- Planning application
- 23/00009/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/00009/FUL, with what the planning evidence pack adds for this site.
Every application in South Staffordshire · Alerts for applications and incidents near here
Status changed from Awaiting Construction to Under Construction on 16 November 2026.
Timeline
- 9 January 2023 Planning application submitted
- 2 February 2024 Planning permission granted
- 1 August 2026 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Preston Hill Farm, Penkridge - Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Preston Hill Farm, Penkridge - Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Preston Hill Farm, Penkridge - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Preston Hill Farm, Penkridge - Solar Farm?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
- Where is Preston Hill Farm, Penkridge - Solar Farm?
- In Penkridge, Staffordshire, United Kingdom (postcode ST19 5RA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).