← Back to London
Planning pack for this site, £295Other options

Solar · United Kingdom

Premier Park, Park Royal - Solar Panels

Operator Segro Plc

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 4 April 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Premier Park, Park Royal - Solar Panels is a 0.2 MW solar farm in Harlesden, London, United Kingdom. Its planning application (24/0357) went to Brent on 14 February 2024 and was granted on 28 March 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 107 other energy sites within 10 km, 85 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Premier Park, Park Royal - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1170, Rooftop solar panels catch fire at IKEA store in Wembley, 2.2 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11702025Rooftop solar panels catch fire at IKEA store in Wembley2.2 kmSignificant
EIR-07742023Solar panel fire destroys roof of Ealing Council house in Greenford6.7 kmMajor
EIR-29392026Rooftop solar fire forces West Drayton school to close early14 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Segro Plc
Location
Units 18 & 19, 7 Premier Park Road, London, NW10 7NZ, United Kingdom
Planning authority
Brent
Planning application
24/0357

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/0357, with what the planning evidence pack adds for this site.

Every application in Brent · Alerts for applications and incidents near here

  • 28 March 2014 Planning permission expired
  • 14 February 2024 Planning application submitted
  • 28 March 2024 Planning permission granted

None found. The register holds no published incident that names Premier Park, Park Royal - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Premier Park, Park Royal - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Premier Park, Park Royal - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Premier Park, Park Royal - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 4 April 2024.
Where is Premier Park, Park Royal - Solar Panels?
In Harlesden, London, United Kingdom (postcode NW10 7NZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).