← Back to Co. Tyrone
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Power Generation Development in Dungannon

Operator Wilmar Llp

Application SubmittedData checked 16 November 2026Source record dated 10 September 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Power Generation Development in Dungannon is a battery storage site 3.7 km south of Coalisland, Co. Tyrone, United Kingdom. Its planning application (LA09/2022/1410/F) went to Mid Ulster on 21 September 2022. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 13 other energy sites within 10 km, 4 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Power Generation Development in Dungannon sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 276 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool276 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells397 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire444 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Wilmar Llp
Location
Lands Approximate 500m Ne of 32 Drumkee Rd., Dungannon (To Rear of Tamnamore, Co. Tyrone, BT71 6JA, United Kingdom
Planning authority
Mid Ulster
Planning application
LA09/2022/1410/F

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LA09/2022/1410/F, with what the planning evidence pack adds for this site.

Every application in Mid Ulster · Alerts for applications and incidents near here

  • 21 September 2022 Planning application submitted

None found. The register holds no published incident that names Power Generation Development in Dungannon. If you know of one, report it (confidential reports are anonymised).

Has Power Generation Development in Dungannon had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Power Generation Development in Dungannon; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Power Generation Development in Dungannon?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 10 September 2025.
Where is Power Generation Development in Dungannon?
3.7 km south of Coalisland, Co. Tyrone, United Kingdom (postcode BT71 6JA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).