Solar · Austria
Pölstal Bezirk Murtal solar project
Operational6.1 MWData checked 8 October 2026Source record dated 8 May 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Pölstal Bezirk Murtal solar project is a 6.1 MW solar farm 24 km north-west of Judenburg, Bezirk Murtal, Styria, Austria. It first operated in 2017. Its status in the Global Energy Monitor solar and wind trackers is operational. There is one other energy site within 10 km. The register holds no incident at this site. It holds 0 incidents at solar farms (hybrid battery and solar sites included) in Austria, and 483 worldwide.
Get an email when Pölstal Bezirk Murtal solar project changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in Austria. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 6.1 MW
- Capacity figure from
- Global Energy Monitor solar and wind trackers
- Status
- Operational (Operating)
- Location
- Pölstal, Bezirk Murtal, Styria, Austria
- First operating
- 2017
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Pölstal Bezirk Murtal solar project. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Pölstal Bezirk Murtal solar project had a fire or other incident?
- None is on the register as of 24 November 2026. The register holds no published incident that names Pölstal Bezirk Murtal solar project; it holds 0 incidents at solar farms (hybrid battery and solar sites included) in Austria.
- What is the status of Pölstal Bezirk Murtal solar project?
- Operational, in the Global Energy Monitor solar and wind trackers, where it last changed on 8 May 2025.
- Where is Pölstal Bezirk Murtal solar project?
- 24 km north-west of Judenburg, Bezirk Murtal, Styria, Austria.
Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).