← Back to Minnesota
Planning pack for this site, £295Other options

Onshore wind · United States

Plum Creek

Operator Geronimo Power

Planned200 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Plum Creek is a 200 MW wind farm 47 km south-east of Marshall, Cottonwood County, Minnesota, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is planned. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 107 incidents at wind farms in the United States, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Plum Creek sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 105 comparable onshore wind incidents in the United States, nearest first. The nearest is EIR-0848, Nacelle fire and blade loss at Endeavor I wind farm, Osceola County, Iowa, 89 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-08482017Nacelle fire and blade loss at Endeavor I wind farm, Osceola County, Iowa89 kmSignificant
EIR-12902018Fatality during equipment loading at Turtle Creek Wind Farm215 kmMajor
EIR-08072020Vestas investigates fourth blade failure at Iowa wind farm since 2019250 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 102 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
200 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Planned
Operator
Geronimo Power
Owner
Geronimo Power
Location
Cottonwood County, Minnesota, United States
Expected
2028
Balancing authority
MISO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Plum Creek. If you know of one, report it (confidential reports are anonymised).

Has Plum Creek had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Plum Creek; it holds 107 incidents at wind farms in the United States.
What is the status of Plum Creek?
Planned, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Plum Creek?
47 km south-east of Marshall, Cottonwood County, Minnesota, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).