Onshore wind · Brazil
Pinheiro Machado wind farm
Operator Rio Energy International · Owner Rio Energy International Inc [100%]
Planned (permitted)402 MWData checked 8 October 2026Source record dated 17 December 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Pinheiro Machado wind farm is a 402 MW wind farm 4.4 km west of Pinheiro Machado, Região Geográfica Intermediária de Pelotas, Rio Grande do Sul, Brazil. Its status in the Global Energy Monitor solar and wind trackers is planned (permitted). There are 2 other energy sites within 10 km. The register holds no incident at this site. It holds 5 incidents at wind farms in Brazil, and 362 worldwide.
Get an email when Pinheiro Machado wind farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in Brazil. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preview of the planning evidence pack for this site
No comparable incidents are recorded near this site yet.
The register holds no onshore wind incident to set against this site today. A pack would still set out the incidents within 50 km of any kind, sites of a similar size worldwide and the guidance consultees cite.
Order the pack for this site. £295, by email in minutes.
The site
- Technology
- Onshore wind
- Capacity
- 402 MW
- Capacity figure from
- Global Energy Monitor solar and wind trackers
- Status
- Planned (permitted) (Pre-construction)
- Operator
- Rio Energy International
- Owner
- Rio Energy International Inc [100%]
- Location
- Pinheiro Machado, Região Geográfica Intermediária de Pelotas, Rio Grande do Sul, Brazil
View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Pinheiro Machado wind farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Pinheiro Machado wind farm had a fire or other incident?
- None is on the register as of 22 November 2026. The register holds no published incident that names Pinheiro Machado wind farm; it holds 5 incidents at wind farms in Brazil.
- What is the status of Pinheiro Machado wind farm?
- Planned (permitted), in the Global Energy Monitor solar and wind trackers, where it last changed on 17 December 2025.
- Where is Pinheiro Machado wind farm?
- 4.4 km west of Pinheiro Machado, Região Geográfica Intermediária de Pelotas, Rio Grande do Sul, Brazil.
Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).