Onshore wind · Brazil

Pinheiro Machado wind farm

Planned (permitted)402 MWChecked 8 October 2026Last changed in the dataset 17 December 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Pinheiro Machado wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
402 MW
Status
Planned (permitted) (Pre-construction)
Operator
Rio Energy International
Owner
Rio Energy International Inc [100%]
Location
Pinheiro Machado, Região Geográfica Intermediária de Pelotas, Rio Grande do Sul, Brazil

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Pinheiro Machado wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.