Pine Forest Solar I

Operator Pine Forest Solar I, LLC

Operational400 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Pine Forest Solar I is a 400 MW battery storage site 20 km east of Sulphur Springs, Hopkins County, Texas, United States. It first operated in 2025. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There is one other energy site within 10 km. The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

The operator's 1 other site and 19 energy sites within 40 km for Pine Forest Solar I

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (200 MWh)
Capacity
400 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational; some generators under construction
Operator
Pine Forest Solar I, LLC
Owner
Pine Forest Solar I, LLC
Location
Hopkins County, Texas, United States
First operating
2025
Expected
2027
Balancing authority
DOPD

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Pine Forest Solar I. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Pine Forest Solar I had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pine Forest Solar I; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of Pine Forest Solar I?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Pine Forest Solar I?
20 km east of Sulphur Springs, Hopkins County, Texas, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).