Solar · United Kingdom

Pilgrims Pre Preparatory School, Brickhill Drive - Solar Panels

Operator Eco UK Group

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 26 August 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Pilgrims Pre Preparatory School, Brickhill Drive - Solar Panels is a 0.2 MW solar farm on the edge of Bedford, United Kingdom. Its planning application (25/01216/SPNJ) went to Bedford on 20 June 2025 and was granted on 8 August 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 39 other energy sites within 10 km, 23 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

ECO UK GROUP LTD (13210828), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Pilgrims Pre Preparatory School, Brickhill Drive - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1493, Solar panels catch fire on Bedford warehouse roof, 3.1 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14932026Solar panels catch fire on Bedford warehouse roof3.1 kmMinor
EIR-14482026Roof fire at new-build house with solar panels in Wellingborough23 kmSignificant
EIR-15452024Fire involving solar panels on a building under construction in Kettering33 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Eco UK Group
Location
Pilgrims Pre Preparatory School, Brickhill Drive, Bedford, Bedfordshire, MK41 7QZ, United Kingdom
Planning authority
Bedford
Planning application
25/01216/SPNJ

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/01216/SPNJ, with what the planning evidence pack adds for this site.

Every application in Bedford · Alerts for applications and incidents near here

  • 20 June 2025 Planning application submitted
  • 8 August 2025 Planning permission granted

None found. The register holds no published incident that names Pilgrims Pre Preparatory School, Brickhill Drive - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Pilgrims Pre Preparatory School, Brickhill Drive - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pilgrims Pre Preparatory School, Brickhill Drive - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Pilgrims Pre Preparatory School, Brickhill Drive - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 26 August 2025.
Where is Pilgrims Pre Preparatory School, Brickhill Drive - Solar Panels?
On the edge of Bedford, United Kingdom (postcode MK41 7QZ).