Around this site

← Back to Sweden

Solar · Sweden

Ökna solar farm

Planned (permitted)709 MWChecked 8 October 2026Last changed in the dataset 19 December 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Ökna solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
709 MW
Status
Planned (permitted) (Pre-construction)
Owner
Ilmatar Energy Oy [100%]
Location
, Sweden
First operating
2036

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Ökna solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.