Around this site

← Back to Sweden

Solar · Sweden

Lindesberg solar farm

Under construction22 MWChecked 8 October 2026Last changed in the dataset 14 January 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Lindesberg solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
22 MW
Status
Under construction (Construction)
Operator
Helios Nordic Energy
Owner
Nordic Energy [100%]
Location
Lindesberg, SE3, Sweden

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Lindesberg solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.