Planning pack for this site, £295Other options

Solar · United Kingdom

Number One Industrial Estate - Solar PV system

Operator Private Developer

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 10 December 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Number One Industrial Estate - Solar PV system is a 0.3 MW solar farm in Consett, County Durham, United Kingdom. Its planning application (DM/21/03372/PNS) went to County Durham on 5 October 2021 and was granted on 30 November 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 21 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Number One Industrial Estate - Solar PV system sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1499, Solar panels linked to fires at council buildings in Northumberland, 29 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14992025Solar panels linked to fires at council buildings in Northumberland29 kmSignificant
EIR-27212025Solar panel fire breaks out at Shanklea Primary School29 kmSignificant
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre32 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Private Developer
Location
Unit 13 Number One Industrial Estate, County Durham, DH8 6SR, United Kingdom
Planning authority
County Durham
Planning application
DM/21/03372/PNS

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DM/21/03372/PNS, with what the planning evidence pack adds for this site.

Every application in County Durham · Alerts for applications and incidents near here

  • 5 October 2021 Planning application submitted
  • 30 November 2021 Planning permission granted

None found. The register holds no published incident that names Number One Industrial Estate - Solar PV system. If you know of one, report it (confidential reports are anonymised).

Has Number One Industrial Estate - Solar PV system had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Number One Industrial Estate - Solar PV system; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Number One Industrial Estate - Solar PV system?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 December 2021.
Where is Number One Industrial Estate - Solar PV system?
In Consett, County Durham, United Kingdom (postcode DH8 6SR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).