← Back to Minas Gerais
Planning pack for this site, £295Other options

Solar · Brazil

Novo Texas solar farm

Operator CEI Solar Empreendimentos Energéticos · Owner CEI Solar Empreendimentos Energéticos SA [100%]

Planned (permitted)60 MWData checked 8 October 2026Source record dated 11 June 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Novo Texas solar farm is a 60 MW solar farm 14 km north-west of Francisco Sá, Região Geográfica Intermediária de Montes Claros, Minas Gerais, Brazil. Its status in the Global Energy Monitor solar and wind trackers is planned (permitted). There are 7 other energy sites within 10 km. The register holds no incident at this site. It holds 18 incidents at solar farms (hybrid battery and solar sites included) in Brazil, and 480 worldwide.

No comparable incidents are recorded near this site yet.

The register holds no solar incident to set against this site today. A pack would still set out the incidents within 50 km of any kind, sites of a similar size worldwide and the guidance consultees cite.

Order the pack for this site. £295, by email in minutes.

Technology
Solar
Capacity
60 MW
Capacity figure from
Global Energy Monitor solar and wind trackers
Status
Planned (permitted) (Pre-construction)
Operator
CEI Solar Empreendimentos Energéticos
Owner
CEI Solar Empreendimentos Energéticos SA [100%]
Location
Francisco Sá, Região Geográfica Intermediária de Montes Claros, Minas Gerais, Brazil
Phases in the tracker
2

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Novo Texas solar farm. If you know of one, report it (confidential reports are anonymised).

Has Novo Texas solar farm had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names Novo Texas solar farm; it holds 18 incidents at solar farms (hybrid battery and solar sites included) in Brazil.
What is the status of Novo Texas solar farm?
Planned (permitted), in the Global Energy Monitor solar and wind trackers, where it last changed on 11 June 2025.
Where is Novo Texas solar farm?
14 km north-west of Francisco Sá, Região Geográfica Intermediária de Montes Claros, Minas Gerais, Brazil.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).