Around this site

← Back to Bahia

Solar · Brazil

Novo Lapa MP solar farm

Planned (permitted)333 MWChecked 8 October 2026Last changed in the dataset 11 June 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Novo Lapa MP solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
333 MW
Status
Planned (permitted) (Pre-construction)
Operator
Enel Green Power Brasil Participações
Owner
Enel Green Power SpA [100%]
Location
Bom Jesus da Lapa, Região Geográfica Intermediária de Guanambi, Bahia, Brazil
Phases in the tracker
8

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Novo Lapa MP solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.