← Back to Texas

Battery storage · United States

Notrees Windpower Hybrid

Operator Deriva Energy · Owner DEGS Wind 1 LLC (99%), TE Notrees LLC (1%)

Operational36 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Notrees Windpower Hybrid is a 36 MW battery storage site 29 km north-east of Kermit, Ector County, Texas, United States. It first operated in 2012. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There is one other energy site within 10 km. The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

The operator's 87 other sites and 16 energy sites within 40 km for Notrees Windpower Hybrid

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (14 MWh)
Capacity
36 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
Deriva Energy
Owner
DEGS Wind 1 LLC (99%), TE Notrees LLC (1%)
Location
Ector County, Texas, United States
First operating
2012
Balancing authority
ERCO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Notrees Windpower Hybrid. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Notrees Windpower Hybrid had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Notrees Windpower Hybrid; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of Notrees Windpower Hybrid?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Notrees Windpower Hybrid?
29 km north-east of Kermit, Ector County, Texas, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).