Solar · United Arab Emirates

Noor Abu Dhabi solar farm

Operational1177 MWChecked 8 October 2026Last changed in the dataset 26 July 2023

Technology
Solar
Capacity
1177 MW
Status
Operational (Operating)
Operator
Sweihan PV Power
Owner
Abu Dhabi National Energy Company PJSC [60%]; Marubeni Corp [20%]; Jinko Power Technology Co Ltd [20%]
Location
Al 'Ajban, Abu Dhabi Emirate, United Arab Emirates
First operating
2019

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Noor Abu Dhabi solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.