← Back to Texas
Planning pack for this site, £295Other options

Solar · United States

New Hickory Solar

Operator New Hickory Solar LLC

Under construction206 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

New Hickory Solar is a 206 MW solar farm 25 km north-west of Edna, Jackson County, Texas, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for New Hickory Solar sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-1928, Hail damages Fighting Jays solar farm southwest of Houston, 107 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-19282024Hail damages Fighting Jays solar farm southwest of Houston107 kmSignificant
EIR-00902024Tracker motor fault exposed solar modules during hailstorm in Fort Bend County, Texas117 kmMinor
EIR-07332026Rooftop solar fire prompts evacuation at Niagara Bottling plant in Seguin, Texas119 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
206 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Under construction
Operator
New Hickory Solar LLC
Owner
New Hickory Solar LLC
Location
Jackson County, Texas, United States
Expected
2026
Balancing authority
ERCO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names New Hickory Solar. If you know of one, report it (confidential reports are anonymised).

Has New Hickory Solar had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names New Hickory Solar; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of New Hickory Solar?
Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
Where is New Hickory Solar?
25 km north-west of Edna, Jackson County, Texas, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).