Battery storage · United Kingdom
Nevendon Battery Storage Extension
Operator Belectric Solar Limited
Operational5 MWData checked 16 November 2026Source record dated 18 February 2025
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Nevendon Battery Storage Extension is a 5 MW battery storage site on the edge of Wickford, Essex, United Kingdom. Its planning application (23/00079/FULL) went to Basildon on 26 January 2023 and was granted on 15 May 2023. It has been operating since 23 October 2024. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 72 other energy sites within 10 km, 39 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Nevendon Battery Storage Extension changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 5 MW (this record)
- All phases
- 15 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Belectric Solar Limited
- Location
- Stevenson Farm Southend Arterial Road Cranes Industrial, Essex, SS14 3JH, United Kingdom
- Planning authority
- Basildon
- Planning application
- 23/00079/FULL
- First operating
- 2024
This record is 5 MW, one part of a site built in phases. With Nevendon (10 MW) the phases on the register add up to 15 MW. Nevendon
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/00079/FULL, with what the planning evidence pack adds for this site.
Every application in Basildon · Alerts for applications and incidents near here
Timeline
- 26 January 2023 Planning application submitted
- 15 May 2023 Planning permission granted
- 23 October 2024 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Nevendon Battery Storage Extension. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Nevendon Battery Storage Extension had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Nevendon Battery Storage Extension; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Nevendon Battery Storage Extension?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 18 February 2025.
- Where is Nevendon Battery Storage Extension?
- On the edge of Wickford, Essex, United Kingdom (postcode SS14 3JH).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).