Planning pack for this site, £295Other options

Solar · United Kingdom

Neilson Road - Solar Photovoltaic Array

Operator Solar Advanced Systems trading

Awaiting Construction0.9 MWData checked 16 November 2026Source record dated 24 February 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Neilson Road - Solar Photovoltaic Array is a 0.9 MW solar farm in Felling, Tyne And Wear, United Kingdom. Its planning application (DC/21/01117/FUL) went to Gateshead on 12 October 2021 and was granted on 10 December 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 133 other energy sites within 10 km, 94 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Neilson Road - Solar Photovoltaic Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1499, Solar panels linked to fires at council buildings in Northumberland, 14 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14992025Solar panels linked to fires at council buildings in Northumberland14 kmSignificant
EIR-27212025Solar panel fire breaks out at Shanklea Primary School14 kmSignificant
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre38 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Solar Advanced Systems trading
Location
Gateshead International Stadium Neilson Road, Gateshead, Tyne And Wear, NE10 0EF, United Kingdom
Planning authority
Gateshead
Planning application
DC/21/01117/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DC/21/01117/FUL, with what the planning evidence pack adds for this site.

Every application in Gateshead · Alerts for applications and incidents near here

  • 12 October 2021 Planning application submitted
  • 10 December 2021 Planning permission granted
  • 10 December 2024 Planning permission expired

None found. The register holds no published incident that names Neilson Road - Solar Photovoltaic Array. If you know of one, report it (confidential reports are anonymised).

Has Neilson Road - Solar Photovoltaic Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Neilson Road - Solar Photovoltaic Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Neilson Road - Solar Photovoltaic Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 24 February 2022.
Where is Neilson Road - Solar Photovoltaic Array?
In Felling, Tyne And Wear, United Kingdom (postcode NE10 0EF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).