Solar · India
Mukand Ltd captive solar farm
Planned (announced)24 MWData checked 8 October 2026Source record dated 9 January 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Mukand Ltd captive solar farm is a 24 MW solar farm 8.6 km west of Gadag-Betageri, Gadag, Karnataka, India. Its status in the Global Energy Monitor solar and wind trackers is planned (announced). There are 12 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 22 incidents at solar farms (hybrid battery and solar sites included) in India, and 480 worldwide.
Get an email when Mukand Ltd captive solar farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in India. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Mukand Ltd captive solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 22 comparable solar incidents in India, nearest first. The nearest is EIR-1480, Fire damages solar panels at Cuddalore power plant, 576 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1480 | 2026 | Fire damages solar panels at Cuddalore power plant | 576 km | Significant |
| EIR-0398 | 2025 | Six workers killed as tower collapses at Avada solar plant in Nagpur | 710 km | Major |
| EIR-1509 | 2016 | Fire damages solar panels at Adani plant in Kamuthi | 736 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 19 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 24 MW
- Capacity figure from
- Global Energy Monitor solar and wind trackers
- Status
- Planned (announced) (Announced)
- Location
- Hulkoti, Gadag, Karnataka, India
View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Mukand Ltd captive solar farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Mukand Ltd captive solar farm had a fire or other incident?
- None is on the register as of 22 November 2026. The register holds no published incident that names Mukand Ltd captive solar farm; it holds 22 incidents at solar farms (hybrid battery and solar sites included) in India.
- What is the status of Mukand Ltd captive solar farm?
- Planned (announced), in the Global Energy Monitor solar and wind trackers, where it last changed on 9 January 2025.
- Where is Mukand Ltd captive solar farm?
- 8.6 km west of Gadag-Betageri, Gadag, Karnataka, India.
Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).