Offshore wind · United Kingdom
Muir Mhòr
Operator Fred. Olsen Seawind & Vattenfall
Application Submitted1,000 MWData checked 16 November 2026Source record dated 16 December 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Muir Mhòr is a 1,000 MW offshore wind farm, United Kingdom. Its planning application went to Marine Scotland on 5 December 2024. Its status in the Renewable Energy Planning Database (UK government) is application submitted. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Muir Mhòr changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, offshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Muir Mhòr sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 14 comparable offshore wind incidents in the United Kingdom, newest first. This site has no map point in the dataset, so the pack lists them newest first.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2973 | 2026 | Siemens Gamesa blade damaged during installation at Orsted Hornsea 3 | not mapped | Significant |
| EIR-2700 | 2026 | Repeat Vestas turbine failures hit pioneering floating wind project in Scotland | not mapped | Significant |
| EIR-0431 | 2025 | Fire-damaged offshore turbine reported under removal, United Kingdom | not mapped | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 11 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Offshore wind
- Capacity
- 1,000 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- Fred. Olsen Seawind & Vattenfall
- Location
- 63km east of Peterhead, Offshore, AB42, United Kingdom
- Planning authority
- Marine Scotland
- Turbines
- 67, 340 m to tip
The planning application page, with what the planning evidence pack adds for this site.
Timeline
- 5 December 2024 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Muir Mhòr. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Muir Mhòr had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Muir Mhòr; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Muir Mhòr?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 16 December 2024.
- Where is Muir Mhòr?
- 63km east of Peterhead, United Kingdom (postcode AB42).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.