Onshore wind · United Kingdom
Mossy Hill
Operator Peel Wind Farms (Peel Energy)
Awaiting Construction46.8 MWData checked 16 November 2026Source record dated 30 March 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Mossy Hill is a 46.8 MW wind farm 3.8 km west of Lerwick, Shetland, United Kingdom. Its planning application (2018/186/PPF) went to Shetland Islands on 27 June 2018 and was granted on 27 May 2019. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 10 other energy sites within 10 km, 5 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Mossy Hill changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Mossy Hill sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-2512, Fire at Viking Wind Farm construction site on Shetland, 20 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2512 | 2023 | Fire at Viking Wind Farm construction site on Shetland | 20 km | Minor |
| EIR-1291 | 2022 | Fatality at Viking wind farm site in Shetland Islands | 20 km | Major |
| EIR-1386 | 2022 | Wind turbine fire near St Cyrus in Aberdeenshire | 383 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 46.8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Peel Wind Farms (Peel Energy)
- Location
- West of A970, includes Tagdale Hill, Hill of Dale, Mossy Hill and Bersa Hill, approx 2.4km from outskirts of Lerwick and approx 4.2km from Lerwick Harbour, Shetland, ZE2 9SB, United Kingdom
- Planning authority
- Shetland Islands
- Planning application
- 2018/186/PPF
- Turbines
- 12, 145 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2018/186/PPF, with what the planning evidence pack adds for this site.
Every application in Shetland Islands · Alerts for applications and incidents near here
Timeline
- 27 June 2018 Planning application submitted
- 27 May 2019 Planning permission granted
- 26 May 2022 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Mossy Hill. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Mossy Hill had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Mossy Hill; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Mossy Hill?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 30 March 2022.
- Where is Mossy Hill?
- 3.8 km west of Lerwick, Shetland, United Kingdom (postcode ZE2 9SB).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).