Solar · United Kingdom
Morrisons, Coventry Road - Solar PV Panels
Operator Sigma Grp · Owner Th Glasshoughton Bidco Limited
Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 6 May 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Morrisons, Coventry Road - Solar PV Panels is a 0.3 MW solar farm on the edge of Birmingham, West Midlands, United Kingdom. Its planning application (2025/01402/PA) went to Birmingham on 7 March 2025 and was granted on 15 April 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 96 other energy sites within 10 km, 81 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Morrisons, Coventry Road - Solar PV Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
SIGMA GRP LIMITED (06856861), active, since 2009. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Morrisons, Coventry Road - Solar PV Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 1.1 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1272 | 2022 | Fire in solar panel distribution board at Birmingham college | 1.1 km | Minor |
| EIR-2523 | 2020 | Suspected solar panel fault sparks roof fire at Ombersley home | 33 km | Significant |
| EIR-0172 | 2026 | Fire at Wheat Leasows solar farm in Telford involves an electricity pylon | 49 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Sigma Grp
- Owner
- Th Glasshoughton Bidco Limited
- Location
- Morrisons, 280 Coventry Road, West Midlands, B10 0XA, United Kingdom
- Planning authority
- Birmingham
- Planning application
- 2025/01402/PA
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2025/01402/PA, with what the planning evidence pack adds for this site.
Every application in Birmingham · Alerts for applications and incidents near here
Timeline
- 7 March 2025 Planning application submitted
- 15 April 2025 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Morrisons, Coventry Road - Solar PV Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Morrisons, Coventry Road - Solar PV Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Morrisons, Coventry Road - Solar PV Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Morrisons, Coventry Road - Solar PV Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 6 May 2025.
- Where is Morrisons, Coventry Road - Solar PV Panels?
- On the edge of Birmingham, West Midlands, United Kingdom (postcode B10 0XA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).