Solar · United Kingdom
Morrison Supermarket, Lysander Road - Solar Panels
Operator Morrisons
Awaiting ConstructionData checked 16 November 2026Source record dated 9 December 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Morrison Supermarket, Lysander Road - Solar Panels is a solar farm 4.7 km west of Stoke Gifford, Gloucestershire, United Kingdom. Its planning application (P22/05949/PNRE) went to South Gloucestershire on 12 October 2022 and was granted on 2 December 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 107 other energy sites within 10 km, 66 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Morrison Supermarket, Lysander Road - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
MORRISONS LIMITED (02280567), active, since 1988. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Morrison Supermarket, Lysander Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1416, Fire at Bristol hospital started in solar panels, 9.5 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1416 | 2025 | Fire at Bristol hospital started in solar panels | 9.5 km | Significant |
| EIR-1274 | 2022 | Fire damages rooftop solar panels at We The Curious in Bristol | 9.5 km | Significant |
| EIR-2065 | 2021 | Loft fire believed caused by a solar panel at Paintworks flats in Bristol | 9.9 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Morrisons
- Location
- Morrison Supermarket Lysander Road Patchway, Gloucestershire, BS10 7UD, United Kingdom
- Planning authority
- South Gloucestershire
- Planning application
- P22/05949/PNRE
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P22/05949/PNRE, with what the planning evidence pack adds for this site.
Every application in South Gloucestershire · Alerts for applications and incidents near here
Timeline
- 12 October 2022 Planning application submitted
- 2 December 2022 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Morrison Supermarket, Lysander Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Morrison Supermarket, Lysander Road - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Morrison Supermarket, Lysander Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Morrison Supermarket, Lysander Road - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 9 December 2022.
- Where is Morrison Supermarket, Lysander Road - Solar Panels?
- 4.7 km west of Stoke Gifford, Gloucestershire, United Kingdom (postcode BS10 7UD).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).