← Back to Colorado
Planning pack for this site, £295Other options

Battery storage · United States

Morel Energy Storage

Operator Morel Energy Storage LLC

Planned200 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Morel Energy Storage is a 200 MW battery storage site 7 km south-west of Craig, Moffat County, Colorado, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is planned. There are 3 other energy sites within 10 km. The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Morel Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 55 comparable battery incidents in the United States, grid-scale only, nearest first. The nearest is EIR-0679, Battery storage failure reported at solar integration site in Flagstaff, Arizona, 685 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06792012Battery storage failure reported at solar integration site in Flagstaff, Arizona685 kmSignificant
EIR-27772025Multiple agencies respond to battery storage fire in Arizona773 kmSignificant
EIR-01012025Battery units ignite at Townsite Solar and Storage in Boulder City, Nevada805 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 52 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage
Capacity
200 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Planned
Operator
Morel Energy Storage LLC
Owner
Morel Energy Storage LLC
Location
Moffat County, Colorado, United States
Expected
2030
Balancing authority
SWPP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Morel Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Morel Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Morel Energy Storage; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of Morel Energy Storage?
Planned, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Morel Energy Storage?
7 km south-west of Craig, Moffat County, Colorado, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).