← Back to Offshore
Planning pack for this site, £295Other options

Offshore wind · United Kingdom

Morecombe Offshore Windfarm

Operator Cobra Instalaciones y Servicios S.A & Flotation Energy

Awaiting Construction480 MWData checked 16 November 2026Source record dated 25 March 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Morecombe Offshore Windfarm is a 480 MW offshore wind farm, United Kingdom. Its planning application (EN010121) went to The Planning Inspectorate - National Infrastructure on 31 May 2024 and was granted on 1 December 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Morecombe Offshore Windfarm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 14 comparable offshore wind incidents in the United Kingdom, newest first. This site has no map point in the dataset, so the pack lists them newest first.

ReferenceYearIncidentFrom the siteSeverity
EIR-29732026Siemens Gamesa blade damaged during installation at Orsted Hornsea 3not mappedSignificant
EIR-27002026Repeat Vestas turbine failures hit pioneering floating wind project in Scotlandnot mappedSignificant
EIR-04312025Fire-damaged offshore turbine reported under removal, United Kingdomnot mappedSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 11 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Offshore wind
Capacity
480 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Cobra Instalaciones y Servicios S.A & Flotation Energy
Location
30km offshore from Blackpool, Offshore, FY1, United Kingdom
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application
EN010121
Turbines
35, 310 m to tip

The planning application page for EN010121, with what the planning evidence pack adds for this site.

Every application in The Planning Inspectorate - National Infrastructure ·

  • 31 May 2024 Planning application submitted
  • 1 December 2025 Planning permission granted
  • 1 December 2032 Planning permission runs out

None found. The register holds no published incident that names Morecombe Offshore Windfarm. If you know of one, report it (confidential reports are anonymised).

Has Morecombe Offshore Windfarm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Morecombe Offshore Windfarm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Morecombe Offshore Windfarm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 25 March 2026.
Where is Morecombe Offshore Windfarm?
30km offshore from Blackpool, United Kingdom (postcode FY1).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.