← Back to Texas

Battery storage · United States

Mesquite Clean Energy Center (BESS)

Operator On Energy Storage

Operational10.1 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Mesquite Clean Energy Center (BESS) is a 10.1 MW battery storage site 6.7 km south of La Feria, Cameron County, Texas, United States. It first operated in 2026. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 4 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

The operator's 10 other sites and 36 energy sites within 40 km for Mesquite Clean Energy Center (BESS)

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (20 MWh)
Capacity
10.1 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
On Energy Storage
Owner
On Energy Storage
Location
Cameron County, Texas, United States
First operating
2026
Balancing authority
ERCO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

Status changed from Under construction to Operational on 26 October 2026.

None found. The register holds no published incident that names Mesquite Clean Energy Center (BESS). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Mesquite Clean Energy Center (BESS) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mesquite Clean Energy Center (BESS); it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of Mesquite Clean Energy Center (BESS)?
Operational, in the U.S. Energy Information Administration, Form EIA-860M, where it last changed on 26 October 2026.
Where is Mesquite Clean Energy Center (BESS)?
6.7 km south of La Feria, Cameron County, Texas, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).