Battery storage · United States
Mesquite Clean Energy Center (BESS)
Operator On Energy Storage
Operational10.1 MWData checked 12 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Mesquite Clean Energy Center (BESS) is a 10.1 MW battery storage site 6.7 km south of La Feria, Cameron County, Texas, United States. It first operated in 2026. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 4 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.
Get an email when Mesquite Clean Energy Center (BESS) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Battery storage (20 MWh)
- Capacity
- 10.1 MW
- Capacity figure from
- U.S. Energy Information Administration, Form EIA-860M
- Status
- Operational
- Operator
- On Energy Storage
- Owner
- On Energy Storage
- Location
- Cameron County, Texas, United States
- First operating
- 2026
- Balancing authority
- ERCO
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Alerts for applications and incidents near here
Status changed from Under construction to Operational on 26 October 2026.
Incidents on the register at this site
None found. The register holds no published incident that names Mesquite Clean Energy Center (BESS). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Mesquite Clean Energy Center (BESS) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Mesquite Clean Energy Center (BESS); it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
- What is the status of Mesquite Clean Energy Center (BESS)?
- Operational, in the U.S. Energy Information Administration, Form EIA-860M, where it last changed on 26 October 2026.
- Where is Mesquite Clean Energy Center (BESS)?
- 6.7 km south of La Feria, Cameron County, Texas, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).