Solar · United Kingdom

Mercedes Benz Of Hertford, Foxholes Business Park - Solar Panels

Operator Mercedes-Benz of Hertford

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 29 March 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Mercedes Benz Of Hertford, Foxholes Business Park - Solar Panels is a 0.2 MW solar farm in Hertford, United Kingdom. Its planning application (3/23/0189/PNPV) went to East Hertfordshire on 2 February 2023 and was granted on 23 March 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 32 other energy sites within 10 km, 19 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Mercedes Benz Of Hertford, Foxholes Business Park - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1514, Garage fire destroys solar panels in Southgate, with a battery storage fault suspected, 19 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15142024Garage fire destroys solar panels in Southgate, with a battery storage fault suspected19 kmMinor
EIR-11702025Rooftop solar panels catch fire at IKEA store in Wembley30 kmSignificant
EIR-07742023Solar panel fire destroys roof of Ealing Council house in Greenford36 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Mercedes-Benz of Hertford
Location
Mercedes Benz Of Hertford Foxholes Business Park, John Tate Road, Hertford, Hertfordshire, SG13 7LB, United Kingdom
Planning authority
East Hertfordshire
Planning application
3/23/0189/PNPV

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 3/23/0189/PNPV, with what the planning evidence pack adds for this site.

Every application in East Hertfordshire · Alerts for applications and incidents near here

  • 2 February 2023 Planning application submitted
  • 23 March 2023 Planning permission granted

None found. The register holds no published incident that names Mercedes Benz Of Hertford, Foxholes Business Park - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Mercedes Benz Of Hertford, Foxholes Business Park - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mercedes Benz Of Hertford, Foxholes Business Park - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Mercedes Benz Of Hertford, Foxholes Business Park - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 29 March 2023.
Where is Mercedes Benz Of Hertford, Foxholes Business Park - Solar Panels?
In Hertford, United Kingdom (postcode SG13 7LB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).