Solar · France

MEES V11 - ADP 11 DE LA CENTRALE SOLAIRE PHOTOVOLTAIQUE DE MEES (LES) (SOLAIRE 1)

Operational2 MWData checked 19 October 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

MEES V11 - ADP 11 DE LA CENTRALE SOLAIRE PHOTOVOLTAIQUE DE MEES (LES) (SOLAIRE 1) is a 2 MW solar farm 22 km south of Sisteron, Les Mées, Alpes-de-Haute-Provence, Provence-Alpes-Côte d'Azur, France. It first operated in 2013. Its status in the Registre national des installations (ODRE, France) is operational. There are 31 other energy sites within 10 km, 27 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 11 incidents at solar farms (hybrid battery and solar sites included) in France, and 480 worldwide.

97 energy sites within 40 km for MEES V11 - ADP 11 DE LA CENTRALE SOLAIRE PHOTOVOLTAIQUE…

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
2 MW
Capacity figure from
Registre national des installations (ODRE, France)
Status
Operational (En service)
Location
Les Mées, Alpes-de-Haute-Provence, Provence-Alpes-Côte d'Azur, France
First operating
2013
Network operator
RTE

View on OpenStreetMap (the dataset gives the commune, so the pin is the commune centre). The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

  • 25 June 2012 Connected to the grid
  • 26 September 2013 Operational

None found. The register holds no published incident that names MEES V11 - ADP 11 DE LA CENTRALE SOLAIRE PHOTOVOLTAIQUE DE MEES (LES) (SOLAIRE 1). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has MEES V11 - ADP 11 DE LA CENTRALE SOLAIRE PHOTOVOLTAIQUE DE MEES (LES) (SOLAIRE 1) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names MEES V11 - ADP 11 DE LA CENTRALE SOLAIRE PHOTOVOLTAIQUE DE MEES (LES) (SOLAIRE 1); it holds 11 incidents at solar farms (hybrid battery and solar sites included) in France.
What is the status of MEES V11 - ADP 11 DE LA CENTRALE SOLAIRE PHOTOVOLTAIQUE DE MEES (LES) (SOLAIRE 1)?
Operational, in the Registre national des installations (ODRE, France).
Where is MEES V11 - ADP 11 DE LA CENTRALE SOLAIRE PHOTOVOLTAIQUE DE MEES (LES) (SOLAIRE 1)?
22 km south of Sisteron, Les Mées, Alpes-de-Haute-Provence, Provence-Alpes-Côte d'Azur, France.

Source: Registre national des installations de production et de stockage d'électricité, ODRE (Open Data Réseaux Énergies), Licence Ouverte v2.0 (Etalab). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).