← Back to Ohio
Planning pack for this site, £295Other options

Battery storage · United States

MCCo BESS Generating Facility

Operator The Medical Center Company

Under construction15.6 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

MCCo BESS Generating Facility is a 15.6 MW battery storage site on the edge of Aurora, Cuyahoga County, Ohio, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. There is one other energy site within 10 km. The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for MCCo BESS Generating Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 55 comparable battery incidents in the United States, grid-scale only, nearest first. The nearest is EIR-0634, Consumers Energy battery fire triggers shelter-in-place in Standish, Michigan, 366 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06342021Consumers Energy battery fire triggers shelter-in-place in Standish, Michigan366 kmSignificant
EIR-26152023Battery fire at New York solar farm prompts shelter-in-place order525 kmSignificant
EIR-01252023Battery storage fire at Chaumont Site 1 prompts shelter-in-place order527 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 52 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage
Capacity
15.6 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Under construction
Operator
The Medical Center Company
Owner
The Medical Center Company
Location
Cuyahoga County, Ohio, United States
Expected
2026
Balancing authority
PJM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names MCCo BESS Generating Facility. If you know of one, report it (confidential reports are anonymised).

Has MCCo BESS Generating Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names MCCo BESS Generating Facility; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of MCCo BESS Generating Facility?
Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
Where is MCCo BESS Generating Facility?
On the edge of Aurora, Cuyahoga County, Ohio, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).