Planning pack for this site, £295Other options

Solar · United Kingdom

Marlborough Drive, Fleckney - Solar Panels

Operator Coba Europe Limited

Awaiting Construction0.4 MWData checked 16 November 2026Source record dated 27 September 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Marlborough Drive, Fleckney - Solar Panels is a 0.4 MW solar farm 3.2 km south-west of Kibworth Harcourt, Leicestershire, United Kingdom. Its planning application (22/01441/PDN) went to Harborough on 8 January 2022 and was granted on 14 September 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 19 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Marlborough Drive, Fleckney - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1554, Fire involving solar panels at a Market Harborough house spreads to an adjoining property, 7.7 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property7.7 kmSignificant
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge12 kmSignificant
EIR-15452024Fire involving solar panels on a building under construction in Kettering26 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Coba Europe Limited
Location
Coba Plastics Ltd Marlborough Drive Fleckney, Leicestershire, LE8 8UR, United Kingdom
Planning authority
Harborough
Planning application
22/01441/PDN

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/01441/PDN, with what the planning evidence pack adds for this site.

Every application in Harborough · Alerts for applications and incidents near here

  • 8 January 2022 Planning application submitted
  • 14 September 2022 Planning permission granted

None found. The register holds no published incident that names Marlborough Drive, Fleckney - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Marlborough Drive, Fleckney - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Marlborough Drive, Fleckney - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Marlborough Drive, Fleckney - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 27 September 2022.
Where is Marlborough Drive, Fleckney - Solar Panels?
3.2 km south-west of Kibworth Harcourt, Leicestershire, United Kingdom (postcode LE8 8UR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).