Battery storage · United Kingdom

Markerstudy Business Park, Wraik Hill - Micro Energy Storage

Operator Zake Sovereign Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 2 December 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Markerstudy Business Park, Wraik Hill - Micro Energy Storage is a 0.2 MW battery storage site on the edge of Whitstable, Kent, United Kingdom. Its planning application (CA/25/01686) went to Canterbury on 16 September 2025 and was granted on 7 November 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 38 other energy sites within 10 km, 5 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Markerstudy Business Park, Wraik Hill - Micro Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 45 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction45 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire208 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells246 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Zake Sovereign Limited
Location
Prospect House, Markerstudy Business Park, Wraik Hill, Whitstable, Kent, CT5 3FD, United Kingdom
Planning authority
Canterbury
Planning application
CA/25/01686

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CA/25/01686, with what the planning evidence pack adds for this site.

Every application in Canterbury · Alerts for applications and incidents near here

  • 16 September 2025 Planning application submitted
  • 7 November 2025 Planning permission granted
  • 7 November 2028 Planning permission runs out

None found. The register holds no published incident that names Markerstudy Business Park, Wraik Hill - Micro Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Markerstudy Business Park, Wraik Hill - Micro Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Markerstudy Business Park, Wraik Hill - Micro Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Markerstudy Business Park, Wraik Hill - Micro Energy Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 December 2025.
Where is Markerstudy Business Park, Wraik Hill - Micro Energy Storage?
On the edge of Whitstable, Kent, United Kingdom (postcode CT5 3FD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).