← Back to Florida
Planning pack for this site, £295Other options

Solar · United States

Maple Trail

Operator Florida Power & Light Co

Under construction74.5 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Maple Trail is a 74.5 MW solar farm 7 km north-west of Macclenny, Baker County, Florida, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. There are 5 other energy sites within 10 km, 4 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Maple Trail sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-2379, Grass fire at Florida Power and Light solar farm in Volusia County, 173 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-23792019Grass fire at Florida Power and Light solar farm in Volusia County173 kmMinor
EIR-04762025Grass fire breaks out at Wild Azalea Solar Energy Center in Florida237 kmMinor
EIR-28612022Georgia home solar fire alleged to follow failed inspections251 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
74.5 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Under construction
Operator
Florida Power & Light Co
Owner
Florida Power & Light Co
Location
Baker County, Florida, United States
Expected
2027
Balancing authority
FPL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Maple Trail. If you know of one, report it (confidential reports are anonymised).

Has Maple Trail had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Maple Trail; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Maple Trail?
Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Maple Trail?
7 km north-west of Macclenny, Baker County, Florida, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).