Planning pack for this site, £295Other options

Battery storage · United Kingdom

Magna Way, Templeborough - Battery Energy Storage Facility

Operator Newton Energi

Awaiting ConstructionData checked 16 November 2026Source record dated 9 May 2022

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Magna Way, Templeborough - Battery Energy Storage Facility is a battery storage site on the edge of Rotherham, South Yorkshire, United Kingdom. Its planning application (RB2022/0622) went to Rotherham on 20 April 2022 and was granted on 21 June 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 92 other energy sites within 10 km, 34 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Magna Way, Templeborough - Battery Energy Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 38 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells38 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool102 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire193 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Newton Energi
Location
Fusion At Magna, Magna Way, Templeborough, Rotherham, South Yorkshire, S60 1FD, United Kingdom
Planning authority
Rotherham
Planning application
RB2022/0622

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for RB2022/0622, with what the planning evidence pack adds for this site.

Every application in Rotherham · Alerts for applications and incidents near here

  • 20 April 2022 Planning application submitted
  • 21 June 2022 Planning permission granted
  • 21 June 2025 Planning permission expired

None found. The register holds no published incident that names Magna Way, Templeborough - Battery Energy Storage Facility. If you know of one, report it (confidential reports are anonymised).

Has Magna Way, Templeborough - Battery Energy Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Magna Way, Templeborough - Battery Energy Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Magna Way, Templeborough - Battery Energy Storage Facility?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 9 May 2022.
Where is Magna Way, Templeborough - Battery Energy Storage Facility?
On the edge of Rotherham, South Yorkshire, United Kingdom (postcode S60 1FD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).