← Back to California
Planning pack for this site, £295Other options

Battery storage · United States

Madena 3

Operator ZGlobal Inc · Owner Western Grid Development, LLC

Under construction3.9 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Madena 3 is a 3.9 MW battery storage site in Plumas Lake, Yuba County, California, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Madena 3 sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 55 comparable battery incidents in the United States, grid-scale only, nearest first. The nearest is EIR-0930, Owner alleges defects, inverter failures and arc flashes at Diablo battery project, 115 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-09302022Owner alleges defects, inverter failures and arc flashes at Diablo battery project115 kmSignificant
EIR-03822026Transformer explosion at California battery storage site triggers mass outage161 kmSignificant
EIR-11362026New fire smoulders at Vistra Moss Landing battery site during cleanup248 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 52 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage
Capacity
3.9 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Under construction
Operator
ZGlobal Inc
Owner
Western Grid Development, LLC
Location
Yuba County, California, United States
Expected
2026
Balancing authority
CISO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Madena 3. If you know of one, report it (confidential reports are anonymised).

Has Madena 3 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Madena 3; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of Madena 3?
Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Madena 3?
In Plumas Lake, Yuba County, California, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).