← Back to Merseyside

Battery storage · United Kingdom

Lister Drive

Operator Arenko Cleantech & Stratcraft · Owner Carnegie (Bes) Ltd

Operational1.8 MWData checked 16 November 2026Source record dated 4 January 2023

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Lister Drive is a 1.8 MW battery storage site in Old Swan, Merseyside, United Kingdom. Its planning application (20F/0335) went to Liverpool on 4 February 2020 and was granted on 2 March 2021. Construction started on 1 May 2021. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 113 other energy sites within 10 km, 31 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

527 energy sites within 40 km for Lister Drive

Members see the sites and incidents around this one, and every record behind them.

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

28 settled days to 4 Nov: 0 MWh out and 626 MWh in, active 100% of half hours. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Technology
Battery storage (Stand-alone Storage)
Capacity
1.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Arenko Cleantech & Stratcraft
Owner
Carnegie (Bes) Ltd
Location
Land Adjacent to Lister Drive, Carnegie Road, Liverpool, Merseyside, L13 7HY, United Kingdom
Planning authority
Liverpool
Planning application
20F/0335

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 20F/0335, with what the planning evidence pack adds for this site.

Every application in Liverpool · Alerts for applications and incidents near here

  • 4 February 2020 Planning application submitted
  • 2 March 2021 Planning permission granted
  • 1 May 2021 Construction started

None found. The register holds no published incident that names Lister Drive. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Lister Drive had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Lister Drive; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Lister Drive?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 January 2023.
Where is Lister Drive?
In Old Swan, Merseyside, United Kingdom (postcode L13 7HY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).