← Back to Cambridgeshire

Energy sites / United Kingdom / Cambridgeshire

Solar · United Kingdom

Lion Yard Shopping Centre, Lion Yard - Solar photovoltaic panels

Awaiting Construction0.3 MWChecked 6 October 2026Last changed in the dataset 15 August 2023

Technology
Solar
Capacity
0.3 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Abrdn
Location
Lion Yard Shopping Centre, St Tibbs Row, Cambridge, Cambridgeshire, CB2 3ET, United Kingdom
Planning authority
Cambridge
Planning application
23/02243/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 13 June 2023 Planning application submitted
  • 11 August 2023 Planning permission granted
  • 11 August 2026 Planning permission expired

None found. The register holds no published incident that names Lion Yard Shopping Centre, Lion Yard - Solar photovoltaic panels. If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack sets out every comparable incident for one project, with sources. £295, by email in minutes.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.