Planning pack for this site, £295Other options

Onshore wind · Germany

Lindern

Operator Lindern Bürgerwindpark GmbH & Co. KG, Elfte Bürgerwind GmbH

Planned20.4 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Lindern is a 20.4 MW wind farm 7.4 km south-east of Werlte, Lindern (Oldenburg), Cloppenburg, Niedersachsen, Germany. It first operated in 2026. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 26 other energy sites within 10 km, 23 of them wind farms. The register holds no incident at this site. It holds 32 incidents at wind farms in Germany, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Lindern sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 26 comparable onshore wind incidents in Germany, nearest first. The nearest is EIR-0808, Nacelle fire at Rhede wind farm prompts Enercon investigation, 43 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-08082018Nacelle fire at Rhede wind farm prompts Enercon investigation43 kmSignificant
EIR-28692026Wind turbine engulfed in flames in Lingen, Emsland, Germany43 kmSignificant
EIR-13522023Turbine fire at Stemwede Bürgerwindpark in Germany64 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 23 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
20.4 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
Lindern Bürgerwindpark GmbH & Co. KG, Elfte Bürgerwind GmbH
Location
Lindern (Oldenburg), Cloppenburg, Niedersachsen, 49699, Germany
First operating
2026
Turbines
3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Lindern. If you know of one, report it (confidential reports are anonymised).

Has Lindern had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names Lindern; it holds 32 incidents at wind farms in Germany.
What is the status of Lindern?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is Lindern?
7.4 km south-east of Werlte, Lindern (Oldenburg), Cloppenburg, Niedersachsen, Germany (postcode 49699).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).