← Back to Derbyshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Langer Lane Solar Farm

Operator Ethical Power Development Limited

Awaiting Construction7.5 MWData checked 16 November 2026Source record dated 19 February 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Langer Lane Solar Farm is a 7.5 MW solar farm in Wingerworth, Derbyshire, United Kingdom. Its planning application (24/00506/MFL) went to North East Derbyshire on 12 July 2024 and was granted on 17 April 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 46 other energy sites within 10 km, 30 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Langer Lane Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 42 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster42 kmSignificant
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent51 kmMinor
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall51 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
7.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Ethical Power Development Limited
Location
E/O Langer Lane, Wingerworth, Chesterfield, Derbyshire, S42 6TS, United Kingdom
Planning authority
North East Derbyshire
Planning application
24/00506/MFL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/00506/MFL, with what the planning evidence pack adds for this site.

Every application in North East Derbyshire · Alerts for applications and incidents near here

  • 12 July 2024 Planning application submitted
  • 17 April 2025 Planning permission granted
  • 17 April 2028 Planning permission runs out

None found. The register holds no published incident that names Langer Lane Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Langer Lane Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Langer Lane Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Langer Lane Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 February 2026.
Where is Langer Lane Solar Farm?
In Wingerworth, Derbyshire, United Kingdom (postcode S42 6TS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).