Application Withdrawn99.9 MWData checked 16 November 2026Source record dated 22 July 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Landulph Substation, Landulph - Battery Storage is a 99.9 MW battery storage site 3.7 km north of Saltash, Cornwall, United Kingdom. Its planning application (PA23/08832) went to Cornwall on 10 January 2024 and was withdrawn on 25 June 2024. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 45 other energy sites within 10 km, 10 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

213 energy sites within 40 km for Landulph Substation, Landulph - Battery Storage

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Stand-alone Storage)
Capacity
99.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
NZED Projectco 2 Limited
Location
South East Of Landulph Substation Landulph, Cornwall, PL12 6NB, United Kingdom
Planning authority
Cornwall
Planning application
PA23/08832

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PA23/08832, with what the planning evidence pack adds for this site.

Every application in Cornwall · Alerts for applications and incidents near here

  • 10 January 2024 Planning application submitted
  • 25 June 2024 Application withdrawn

None found. The register holds no published incident that names Landulph Substation, Landulph - Battery Storage. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Landulph Substation, Landulph - Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Landulph Substation, Landulph - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Landulph Substation, Landulph - Battery Storage?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 22 July 2024.
Where is Landulph Substation, Landulph - Battery Storage?
3.7 km north of Saltash, Cornwall, United Kingdom (postcode PL12 6NB).