Solar · United Kingdom
Land North of Hill Farm
Operator Greenheath Farming
Awaiting Construction8.9 MWData checked 16 November 2026Source record dated 27 April 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Land North of Hill Farm is a 8.9 MW solar farm 11 km south of Banbury, Oxfordshire, United Kingdom. Its planning application (20/00574/F) went to Cherwell on 26 February 2020 and was granted on 5 October 2020. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 13 other energy sites within 10 km, 11 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Land North of Hill Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Land North of Hill Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 50 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 50 km | Significant |
| EIR-2109 | 2015 | Solar installer falls through fragile farm roof at Kemble, suffering brain injuries | 57 km | Major |
| EIR-1448 | 2026 | Roof fire at new-build house with solar panels in Wellingborough | 57 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 8.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Greenheath Farming
- Location
- Land North Of Hill Farm, Hill Farm Lane, Duns Tew, Bicester, Oxfordshire, OX25, United Kingdom
- Planning authority
- Cherwell
- Planning application
- 20/00574/F
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 20/00574/F, with what the planning evidence pack adds for this site.
Every application in Cherwell · Alerts for applications and incidents near here
Timeline
- 26 February 2020 Planning application submitted
- 5 October 2020 Planning permission granted
- 5 October 2023 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Land North of Hill Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Land North of Hill Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Land North of Hill Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Land North of Hill Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 27 April 2020.
- Where is Land North of Hill Farm?
- 11 km south of Banbury, Oxfordshire, United Kingdom (postcode OX25).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).