Onshore wind · Ghana
Koluedor wind farm
Owner NEK Umwelttechnik AG [100%]
Cancelled160 MWData checked 12 November 2026Source record dated 18 February 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Koluedor wind farm is a 160 MW wind farm 47 km north-east of Tema New Town, Greater Accra, Ghana. Its status in the Global Energy Monitor solar and wind trackers is cancelled. There are 4 other energy sites within 10 km, 3 of them wind farms. The register holds no incident at this site. It holds 0 incidents at wind farms in Ghana, and 362 worldwide.
Get an email when Koluedor wind farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in Ghana. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 160 MW
- Capacity figure from
- Global Energy Monitor solar and wind trackers
- Status
- Cancelled
- Owner
- NEK Umwelttechnik AG [100%]
- Location
- Sege, Greater Accra, Ghana
View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Koluedor wind farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Koluedor wind farm had a fire or other incident?
- None is on the register as of 22 November 2026. The register holds no published incident that names Koluedor wind farm; it holds 0 incidents at wind farms in Ghana.
- What is the status of Koluedor wind farm?
- Cancelled, in the Global Energy Monitor solar and wind trackers, where it last changed on 18 February 2025.
- Where is Koluedor wind farm?
- 47 km north-east of Tema New Town, Greater Accra, Ghana.
Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).