Solar · United Kingdom
Knowledge Dock, University Way - Solar Panel
Operator University of East London
Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 21 September 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Knowledge Dock, University Way - Solar Panel is a 0.2 MW solar farm on the edge of Charlton, London, United Kingdom. Its planning application (23/01611/PREPV) went to Newham on 19 July 2023 and was granted on 12 September 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 130 other energy sites within 10 km, 82 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Knowledge Dock, University Way - Solar Panel changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
UNIVERSITY OF EAST LONDON STUDENTS' UNION (10820498), active, since 2017. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Knowledge Dock, University Way - Solar Panel sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1173, Rooftop solar panel fire on residential block in Lewisham, London, 7.1 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1173 | 2024 | Rooftop solar panel fire on residential block in Lewisham, London | 7.1 km | Significant |
| EIR-1305 | 2017 | Fire at Thornton Heath flats reported to have been caused by an overheated solar panel | 16 km | Significant |
| EIR-1514 | 2024 | Garage fire destroys solar panels in Southgate, with a battery storage fault suspected | 19 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- University of East London
- Location
- Knowledge Dock, University Way, Beckton, Victoria Dock, London, E16 2RD, United Kingdom
- Planning authority
- Newham
- Planning application
- 23/01611/PREPV
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/01611/PREPV, with what the planning evidence pack adds for this site.
Every application in Newham · Alerts for applications and incidents near here
Timeline
- 19 July 2023 Planning application submitted
- 12 September 2023 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Knowledge Dock, University Way - Solar Panel. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Knowledge Dock, University Way - Solar Panel had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Knowledge Dock, University Way - Solar Panel; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Knowledge Dock, University Way - Solar Panel?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 21 September 2023.
- Where is Knowledge Dock, University Way - Solar Panel?
- On the edge of Charlton, London, United Kingdom (postcode E16 2RD).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).