Solar · United Kingdom
Kneller Hall School
Operator Radnor House School Limited
Under Construction0.3 MWData checked 16 November 2026Source record dated 26 January 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Kneller Hall School is a 0.3 MW solar farm on the edge of Hounslow, London, United Kingdom. Its planning application (22/3004/FUL) went to Richmond upon Thames on 2 December 2022 and was granted on 15 October 2025. Construction started on 1 December 2025. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 97 other energy sites within 10 km, 64 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Kneller Hall School changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Kneller Hall School sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0774, Solar panel fire destroys roof of Ealing Council house in Greenford, 8.8 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0774 | 2023 | Solar panel fire destroys roof of Ealing Council house in Greenford | 8.8 km | Major |
| EIR-2939 | 2026 | Rooftop solar fire forces West Drayton school to close early | 9.7 km | Significant |
| EIR-1170 | 2025 | Rooftop solar panels catch fire at IKEA store in Wembley | 12 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- Radnor House School Limited
- Location
- Kneller Hall, Royal Military School Of Musickneller Road, Twickenham, London, TW2 7DU, United Kingdom
- Planning authority
- Richmond upon Thames
- Planning application
- 22/3004/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 22/3004/FUL, with what the planning evidence pack adds for this site.
Every application in Richmond upon Thames · Alerts for applications and incidents near here
Timeline
- 2 December 2022 Planning application submitted
- 15 October 2025 Planning permission granted
- 1 December 2025 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Kneller Hall School. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Kneller Hall School had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Kneller Hall School; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Kneller Hall School?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 26 January 2026.
- Where is Kneller Hall School?
- On the edge of Hounslow, London, United Kingdom (postcode TW2 7DU).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).