Battery storage · United Kingdom
Kilmarnock Battery Energy Storage System
Awaiting Construction500 MWChecked 6 October 2026Last changed in the dataset 15 June 2026
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 500 MW
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Matrix Renewables
- Location
- 250 metres (m) to the north of the existing Kilmarnock South Substation, Ayrshire, KA1 5JW, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- ECU00004941
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Timeline
- 28 September 2023 Planning application submitted
- 7 April 2025 Planning permission granted
- 7 April 2028 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Kilmarnock Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).
Follow Kilmarnock Battery Energy Storage System
Get one email when this site's status changes in the Renewable Energy Planning Database (UK government), or when the register publishes an incident that names it. Free, no account needed, unsubscribe in one click.
By following you agree to the privacy policy.
Incidents at battery storage sites in the United Kingdom
The register holds 14 incidents at battery storage sites in the United Kingdom, 9 of them fires, and 177 worldwide. Counts of incidents in published reporting, not rates.
- Fire in home battery storage system connected to solar panels
- Gas leak at Cockenzie battery storage site under construction
- Short circuit in lithium battery cells reported as cause of fire at Rufford Colliery BESS
- Smoke and fire incident at Battery Box, Pinhoe Road, Exeter
- Battery storage site fire in East Tilbury brought under control after 24 hours
What fails at battery storage sites · All battery storage incidents
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack sets out every comparable incident for one project, with sources. £295, by email in minutes.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.