Battery storage · United Kingdom

Eccles II Substation - Battery Energy Storage System

Operator Matrix Renewables · Owner Eccles Energy Centre Limited

Under Construction500 MWData checked 16 November 2026Source record dated 30 March 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Eccles II Substation - Battery Energy Storage System is a 500 MW battery storage site 11 km north-east of Kelso, Scottish Borders, United Kingdom. Its planning application (ECU00004804) went to Scottish Government (S36) on 2 May 2023 and was granted on 16 December 2024. Construction started on 1 January 2026. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 12 other energy sites within 10 km, 10 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Eccles II Substation - Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 256 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool256 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells294 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire441 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
500 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Matrix Renewables
Owner
Eccles Energy Centre Limited
Location
W/O Eccles Substation, approximately 2.3 km S/O Leitholm, Scottish Borders, TD12 4JA, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00004804

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00004804, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 2 May 2023 Planning application submitted
  • 16 December 2024 Planning permission granted
  • 1 January 2026 Construction started

None found. The register holds no published incident that names Eccles II Substation - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Has Eccles II Substation - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Eccles II Substation - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Eccles II Substation - Battery Energy Storage System?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 30 March 2026.
Where is Eccles II Substation - Battery Energy Storage System?
11 km north-east of Kelso, Scottish Borders, United Kingdom (postcode TD12 4JA).