Solar · United Kingdom

Kerswell Barton Farm, Broadclyst - Solar Panels

Operator MJ Quinn Integrated Services Limited

Awaiting Construction16.2 MWData checked 16 November 2026Source record dated 16 September 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Kerswell Barton Farm, Broadclyst - Solar Panels is a 16.2 MW solar farm 6.4 km north-east of Exeter, Devon, United Kingdom. Its planning application (25/0467/MFUL) went to East Devon on 13 March 2025 and was granted on 7 August 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 63 other energy sites within 10 km, 40 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Kerswell Barton Farm, Broadclyst - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1486, Fire under solar panels at Broadclyst brought under control, 1.6 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14862026Fire under solar panels at Broadclyst brought under control1.6 kmSignificant
EIR-14682026Solar panels involved in fire that destroyed a Sidmouth bungalow17 kmMajor
EIR-15232026Fire damages solar panel batteries in a Teignmouth garage22 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
16.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
MJ Quinn Integrated Services Limited
Location
Kerswell Barton Farm, Broadclyst, Exeter, Devon, EX5 3AF, United Kingdom
Planning authority
East Devon
Planning application
25/0467/MFUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/0467/MFUL, with what the planning evidence pack adds for this site.

Every application in East Devon · Alerts for applications and incidents near here

  • 13 March 2025 Planning application submitted
  • 7 August 2025 Planning permission granted
  • 7 August 2028 Planning permission runs out

None found. The register holds no published incident that names Kerswell Barton Farm, Broadclyst - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Kerswell Barton Farm, Broadclyst - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Kerswell Barton Farm, Broadclyst - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Kerswell Barton Farm, Broadclyst - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 September 2025.
Where is Kerswell Barton Farm, Broadclyst - Solar Panels?
6.4 km north-east of Exeter, Devon, United Kingdom (postcode EX5 3AF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).