Solar · United Kingdom
John Lennon Airport Scheme
Operator Liverpool John Lennon Airport Plc
Revised3 MWData checked 16 November 2026Source record dated 19 January 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
John Lennon Airport Scheme is a 3 MW solar farm in Speke, Merseyside, United Kingdom. Its planning application (21/00310/PLD) went to Halton on 14 May 2021 and was withdrawn on 14 September 2021. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 59 other energy sites within 10 km, 34 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when John Lennon Airport Scheme changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for John Lennon Airport Scheme sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 27 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1244 | 2018 | Fire reported to have started in solar panels at Westleigh primary school | 27 km | Significant |
| EIR-1485 | 2026 | Faulty solar panel wiring sparks house fire in Stoke-on-Trent | 53 km | Minor |
| EIR-1553 | 2017 | Roof fire involving 14 solar panels attended in Shropshire | 53 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Revised
- Operator or applicant
- Liverpool John Lennon Airport Plc
- Location
- Dungeon Lane, Hale Road And Baileys Lane To The East Of Liverpool John Lennon Airport Speke, Merseyside, L24 1YD, United Kingdom
- Planning authority
- Halton
- Planning application
- 21/00310/PLD
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 21/00310/PLD, with what the planning evidence pack adds for this site.
Every application in Halton · Alerts for applications and incidents near here
Timeline
- 14 May 2021 Planning application submitted
- 14 September 2021 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names John Lennon Airport Scheme. If you know of one, report it (confidential reports are anonymised).
Questions
- Has John Lennon Airport Scheme had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names John Lennon Airport Scheme; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of John Lennon Airport Scheme?
- Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 19 January 2022.
- Where is John Lennon Airport Scheme?
- In Speke, Merseyside, United Kingdom (postcode L24 1YD).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).